Say you’ve got a 2.8 m door with a roof beam landing 900 mm above it. You run the lintel and get 123 kNm of factored moment. Then you take arching, spread the beam load through the wall, and get 98. Good drop. But if you check where it came from, arching gave you about 2 kNm. The other 23 came from letting the beam load spread out through the masonry.
Why so little from arching? It only takes off wall weight. With arching, the lintel carries a 45 degree triangle of wall instead of the full height. The beam load doesn’t arch away. It still lands on the lintel, just over a wider length. CSA S304-14 Cl. 7.14.2 sets how far it spreads. The steps below follow S304-14, the edition NBC 2020 references.
Draw the 45 degree triangle and find the apex
Start with the span. Take \(L\) as the clear opening plus one bearing length, centre to centre of the bearings. Now rise at 45 degrees from each end. The two lines meet at the apex, \(h_a = L/2\) above the lintel. The wall inside that triangle is what the lintel carries. The wall outside it arches over to the piers on either side.
That gives a triangular load. It’s zero at the supports and \(w_{wall} h_a\) at midspan, where \(w_{wall}\) is the wall weight per unit area of wall face. Its midspan moment is:
$$M_t = \frac{w_t L^2}{12}, \quad w_t = w_{wall} h_a$$Add the lintel self-weight as a uniform load, \(w_s L^2/8\). On a 3.0 m span the apex sits 1.5 m up. Mark it on the elevation first. The depth and floor checks both measure from it.

Check three conditions before you take the reduction
Here’s the catch. CSA S304-14 has no arching rule for lintels. Its Annex F arch provisions only cover empirical arches in veneer and nonloadbearing walls. The working rule comes from CMHA TEK 17-01D, so you have to justify it on your own drawings. Arching only forms when all three of these hold:
- Wall on each side to take the thrust. An arch pushes outward at its ends. Give the lintel at least 200 mm of bearing. Then make sure the pier beside the opening is long enough to resist the sideways kick. A narrow pier between two openings is where this usually fails.
- At least 203 mm of masonry above the apex. The arch’s compression runs through that band. On a 3.0 m span you need masonry up to \(1500 + 203 = 1703\) mm above the lintel.
- No distributed floor or roof load below the arch. A slab or joist line bearing below \(h_a + 203\) mm breaks the arch. If you’ve got one, design the lintel for the full wall height plus that load, both as uniform loads. A beam is different. A point load doesn’t stop the arch, since TEK 17-01D only asks that loads inside the triangle be carried. It just goes to the lintel in full.
So on a 3.0 m span, a floor bearing less than 1.7 m above the lintel rules arching out.
Spread the point load per S304-14 Cl. 7.14.2, not at 60 degrees
Arching does nothing for a point load. A roof beam or joist girder bearing on the wall above the lintel is carried in full, whatever its height. The calc below carries all of it.
What you can do is spread it. CSA S304-14 Cl. 7.14.2 spreads a point load down from the edges of the bearing plate. Through hollow or partly grouted masonry it spreads at 22 degrees to the vertical, which is 2.5 vertical to 1 horizontal. Through solid brick or fully grouted masonry it opens to 45 degrees. For hollow block, the load reaches the lintel over:
$$l_p = b_p + \frac{2 h_p}{2.5} \le L$$where \(b_p\) is the bearing plate length and \(h_p\) is the height of the load above the lintel. Many textbooks spread at 60 degrees instead, \(b_p + 2 h_p / \tan 60^\circ\). For hollow block that’s a wider spread and a lower moment than S304 allows. For grouted masonry it’s narrower than the code’s 45 degrees, so it’s conservative. Take the example below with a fully grouted wall at 3.91 kPa. The load spreads over 2300 mm and \(M_f\) drops to 80.3 kNm.

The higher the beam pocket, the more the spread pays. Pick the angle from the masonry between the plate and the lintel. Use the S304 rule so the clause on your calc sheet matches the number.
Worked example: a 2.8 m door lintel under a roof beam
Here’s the full example. A 190 mm block wall has a 2.8 m door opening. Over it sits a 1000 mm deep fully grouted lintel with 200 mm bearings on grouted jamb cores. There’s 1.8 m of hollow block above the lintel at 2.11 kPa. A roof beam bears on a 500 mm plate centred over midspan, 900 mm above the lintel. It brings 81 kN dead and 32.4 kN snow (the Cb, Cw and Cs factors behind that snow load). Under NBCC 2020 Table 4.1.3.2.-A, \(1.25D + 1.5S\) governs, so \(P_f = 150\) kN. The combinations are covered in the load combination post, where snow as the principal load sets the roof case.
The wall reaches 1800 mm, past the 1703 mm arching line. The roof beam is a point load, and no other roof framing bears on this wall. So arching applies to the wall, and the beam load goes on in full.
Factored moment on a 2.8 m masonry door lintel with arching and a dispersed roof beam load
45° arching triangle on the wall; point load carried in full and spread at 2.5:1 through the hollow block; simply supported lintel
16 input values\(L_o = 2800\) mm, \(h_{wall} = 1800\) mm, \(P_D = 81\) kN ...
Step 1: Span\(L = 3.00\ \text{m}\)
Step 2: Apex of the arching triangle\(h_a = 1.50\ \text{m}\)
Step 3: Peak triangular wall load\(w_t = 3.17\ \text{kN/m}\)
Step 4: Lintel self-weight\(w_s = 3.91\ \text{kN/m}\)
Step 5: Point load spread at the lintel\(l_p = 1220\ \text{mm}\)
Step 6: Moment per kN of spread load\(m_p = 0.5975\ \text{m}\)
Step 7: Dead load moment\(M_D = 55.17\ \text{kN·m}\)
Step 8: Snow load moment\(M_S = 19.36\ \text{kN·m}\)
Step 9: Factored moment\(M_f = 98.0\ \text{kN·m}\)
The lintel needs 98.0 kNm against a resistance of 142.5 kNm. Flexure and shear have room to spare. The 200 mm bearing doesn’t, so lengthen it before you trim the steel. The calc doesn’t check the wall under the beam plate, or the piers for the arch thrust. Check those separately under S304-14 Cl. 7.14. Keep the spread angle consistent with the grouting you assume there.
Where the saving actually comes from
Run the same lintel four ways and you can see where the saving comes from.
| Case | Wall load | Point load | \(M_f\) (kNm) |
|---|---|---|---|
| No arching, no spread | Full 1.8 m of wall | At midspan, zero width | 123 |
| Arching, no spread | 45 degree triangle | At midspan, zero width | 121 |
| Arching, S304 spread, hollow block | 45 degree triangle | 2.5:1 over 1220 mm | 98.0 |
| Arching, textbook spread | 45 degree triangle | 60 degrees over 1540 mm | 92.0 |
Arching saves only 2.4 kNm here, because 1.8 m of hollow block isn’t much weight. The point load spread saves 23 kNm against a zero-width load at midspan. About 9 kNm of that comes from the 500 mm plate alone. The other 14 kNm comes from spreading through 900 mm of masonry. Arching only starts to pay on tall walls. With 6.0 m of the same block above the lintel, the triangle saves 14.8 kNm factored. That’s with the beam still bearing at 900 mm and no floors in between.
On a single-storey lintel under a beam, put your effort into the spread. Take arching only when the wall above is tall.
Where the method breaks
- Deep lintels. With \(L/h\) under 2 on a simple span, S304-14 Cl. 11.2.7.1 requires deep beam design with a reduced lever arm. You may take \(d\) as 0.67 of the section depth, but not more than 0.35 times the span. A 1000 mm deep lintel on a 1.8 m span (\(L/h\) = 1.8) is in that range. Shear deformation starts to matter at those proportions too, as the deep member post shows with its span-to-depth comparison.
- Control joints at the jamb. A vertical joint at the edge of the opening can break the thrust path on that side. S304-14 Cl. 7.14.2 also stops any point load spread at it. People often still assume arching with a joint there. Check where the thrust goes before you rely on it, or design for the full load.
- Short piers. A narrow pier between two openings may not resist the thrust of two arches. Check it, or treat both lintels as non-arching.
- Edition drift. S304:24 drops the \(\chi\) factor from the stress block (Cl. 12.2.1.6). It also moves the beam clauses from Section 11 to Section 12, with shear in Cl. 12.3. NBC 2020 still references S304-14. Check which edition your jurisdiction adopts before you copy clause numbers between calcs.
Monday checklist
- On your next lintel, find \(h_a + 203\) mm. Mark every floor and distributed roof bearing against it before you choose arching.
- Spread every point load per S304-14 Cl. 7.14.2: 2.5:1 through hollow block, 45 degrees through fully grouted masonry. Write the clause on the calc instead of 60 degrees.
- Check end bearing at 200 mm before the steel. On the example lintel it governs at 100 percent, while flexure sits at 69 percent.